Bridge Business

ecoRDT Girder

ecoRDT Girder Overview

Overview

Introduction

  • The PSC construction method that has significantly reduced the height of upper structure by placing soil for vegetation in the top-open shaped girder.

  • Efficient and safe sections that retain the advantages of the PSC I type girder
  • Extra space for containing vegetation and soil by reflecting the characteristics of the eco-corridor

Overview