Dear Customers;
Founded in 1999 with the Preflex construction method, SAMHYUN BnE now celebrates its 20th year of
establishment.
Introducing our Precom construction method to the world in 2005, our company has been widely recognized
with our technology that provides excellent economic efficiency and convenience in construction. Then, after
the launching of the Precom Rahmen, we have also got recognition for our steel composite girder technique.
Besides, we succeeded to realize the low-height PSC beam through the development of the BiCon girder.
Followed by the series of success made from the development of steel composite girder and PSC beam, our
company started working on the steel bridge technique, and including the HDBox which is the improved version
of the existing steel-box, we have launched the HiTAB girder that can apply a maximum of 150m span, which
all has made us construct the longest span bridge that is both economical and offers fine view.
Attaining the state-level glory, SAMHYUN BnE received the grand prize in the Land, Infrastructure and
Transportation Technology Awards 2013 for our excellent accomplishment.
Even so, by not satisfying with our achievements so far, we have expanded our areas of business into the SC
Hybrid Rahmen bridges, launching crane that can construct bridges without being affected by the topography.
Our company has been able to grow from the enormous domestic and outside crisis because we never stopped
conducting research and development by not forgetting our original intention. So, we promise that all of the
members of SAMHYUN BnE will always make a step forward to another level with the mind of not being satisfied
with the current stage.
- CEO Choi, Dongnam